June 6, 2010 on 8:28 pm | In Uncategorized | Comments Off

Yesterday, Saturday, was a pretty busy day.  Made a lot of progress although it does not look so in the pictures.  The roof rolled off as far as I need it to clear the trees in the west.  Started on the slip-joint on the side of the roof to keep the bugs out.  Adjusted the openings for the wheels to run throught the track and started the double inside insulation to create the vent channels under the roof, and Romaine started the painting of the outside of the building. 

   IMG_5697Small.JPG 

Entries and comments feeds. Valid XHTML and CSS. ^Top^ Powered by WordPress with jd-nebula-3c theme design by John Doe.